Home
About Us
Company Profile
Development History
Honors
Social Responsibility
Group News
Corporate Culture
Application
Product
Integrated device
Box-type substation
High-voltage switchgear
Medium-Voltage Switchgear
Low-Voltage Switchgear
Transformer
Components
Case
Application Cases
Engineering Case
Research & Services
Research findings
Quality Management
High-quality equipment
After-sales service
Seeking Talent
Talent Philosophy
Job Recruitment
Contact us
Group Updates
Rwanda: Three Transformers Successfully Pass FAT and Ready for Shipment
In mid-to-late October, engineers from the Rwandan end client and general contractor visited Ningbo Tian’an for the factory acceptance test (FAT) witness inspection of transformers. This order covers two sets of 110kV power transformers and one 33kV earthing transformer, which will be deployed for the construction of two substations in Rwanda. It marks a repeat order from the African market.
2026-11-06 12:41
Behind Repeat Purchases from Longtime Customers | Tian’an’s 132kV Main Transformer Powers Zambia’s Grid Upgrade
In early September, Ningbo Tian’an successfully completed the delivery of an order from a long-standing strategic customer in Zambia: a fully assembled SFZ‑20000/132kV high‑voltage main transformer, destined to support a key local power‑grid upgrade project. Building on its strong reputation cultivated through previous projects, this repeat purchase underscores Tian’an’s high‑voltage transformers’ robust adaptability to Africa’s extreme heat, sand and dust, and grid‑fluctuation conditions, with a comprehensive international fulfillment loop spanning product performance, factory acceptance testing, and ocean‑freight logistics.
2026-09-22 08:52
Going Global: Strengthening Localized Adaptation | Tian’an Complete Switchgear Delivered to a Zambian Infrastructure Project
Recently, a complete set of power distribution equipment was fully assembled in Ningbo and dispatched to Zambia for an infrastructure project. This order includes seven GGD low-voltage switchgear cabinets, eight JXF distribution boxes, and a large quantity of cable clamps. After passing all factory‑acceptance tests, the entire system has been shipped overseas, where it will support the construction of Zambia’s local infrastructure power distribution network, ensuring a stable and reliable electricity supply for the project.
2026-09-16 15:02
Local Expertise Ensures Smooth Operations | Tian’an Engineering Supports Ningbo Metro Line 12 as It Begins Trial Operations
On September 14, Ningbo Metro Line 12 officially commenced trial operations. This line has established a vital rail‑transit link between the Xiangshan Coastal Peninsula and Ningbo’s main urban area, fulfilling the long‑awaited dream of Xiangshan residents to have access to the metro and marking Xiangshan’s official entry into the era of rail transit. As a locally‑based enterprise with deep roots in Xiangshan, Ningbo Tian’an Equipment Installation Engineering Co., Ltd. (Tian’an Engineering) played a key role in the project’s electrical installation and construction, upholding the safety of local rail travel through meticulous craftsmanship and practical execution, thereby demonstrating the responsibility and commitment of a homegrown company.
2026-09-14 14:51
Quality Enhancement and Efficiency Improvement, Digital Empowerment | Tian’an’s various business units are conducting a series of specialized training sessions on AI agents.
To implement the Group’s strategic plan, articulated at its 2026 Mid-Year Work Conference—“Focusing on quality improvement and efficiency gains while accelerating digital transformation”—and to integrate artificial intelligence technologies more deeply into every stage of business operations, Tian’an Development Industrial Group recently organized a series of specialized AI‑powered training sessions across its four core business segments: Tian’an Engineering, Tian’an Power, Tian’an Import & Export, and Tian’an Automotive. The Group’s Chairman, Jiang Shanwen, personally served as the keynote instructor, with mid‑level and senior managers, key business personnel, and core members of the Commercial Department participating in phased sessions. These initiatives aim to leverage digital tools to enhance industrial operations and elevate the overall quality of the Group’s performance.
2026-08-31 20:01
Typhoon-Resilient Power Supply | The Tian’an Operation and Maintenance Team Bravely Faced Typhoon “Saudel,” Safeguarding Highways’ Power Supply
Affected by this year’s No. 18 typhoon, “Saudel,” the coastal areas of Ningbo have experienced strong winds and heavy rainfall, putting the power infrastructure at regional highway service areas under severe strain in the face of flood and typhoon preparedness. In response to the operational risks posed by these meteorological hazards, the operations and maintenance team of Ningbo Tian’an Equipment Installation Engineering Co., Ltd. promptly activated its typhoon‑and‑flood‑response emergency plan, rushing to stations along the highway to conduct specialized inspections of electrical equipment and address potential safety concerns, thereby ensuring stable power supply at highway service areas and safeguarding the safe use of electricity for drivers and passengers on the road.
2026-08-31 19:59
Tian’an Electric invites you to attend the Middle East Electricity Exhibition 2026 (MEE 2026).
From September 1 to 3, 2026, the Middle East Electricity Exhibition (MEE) will be held at the Dubai World Trade Centre in the United Arab Emirates. As one of the most influential energy industry events in the Middle East, this exhibition brings together power‑equipment companies from around the world, showcasing cutting‑edge technologies and solutions for the power sector.
2026-08-27 16:19
Empowering Overseas Infrastructure | Ningbo Tian’an Transformer and Switchgear Complete Sets Shipped to Zambia
In August 2026, the SFZ‑20000/33‑11 three-phase oil‑immersed on‑load tap‑changing power transformer, independently designed and manufactured by Ningbo Tian’an, together with nine KYN61‑40.5/1250A‑31.5kA armored withdrawable high‑voltage switchgear units, will be officially packed and shipped after completing the full set of factory acceptance tests, and will be delivered to the Zambia project site by sea.
2026-08-25 09:48
2026-11-06
2026-09-22
2026-09-16
2026-09-14
2026-08-31
2026-08-27
2026-08-25
Venturing overseas to deepen energy infrastructure development in East Africa, Ningbo Tian’an has dispatched four 110kV transformers in batches to the NYAMATA Substation in Rwanda.
2026-07-31
In June–July 2026, four 110 kV oil-immersed power transformers (rated at 20 MVA and 30 MVA), independently developed and manufactured by Ningbo Tian’an Electric, along with a complete set of accompanying components, will be loaded onto ships in batches at the ports of Ningbo and Shanghai. The equipment will then be shipped across the ocean to Kigali, Rwanda, where it will be deployed as part of the new construction and upgrade project at the NYAMATA Substation, providing comprehensive support for the expansion and modernization of the Rwandan capital’s core power grid and ensuring a continuous, stable power supply to urban districts.